Septic System Excavation in Kootenai County

Digging for a septic system in Kootenai County starts with a permit from Panhandle Health District. The district sets how test holes are dug, how far a drainfield must be from water, and when the system can be covered, and installations on the Rathdrum Aquifer have a minimum parcel size.

Email us about your project: contact@cdaexcavation.com

What septic system excavation involves

A septic system has a tank, pipes and a drainfield, and all three go in by excavation. The tank needs a hole of the right size, the pipes need trenches at the right slope, and the drainfield must follow the contour of the hillside and stay level. Because wastewater is involved, the district regulates the work, not only the contractor and the landowner.

The first dig is the test hole. PHD's guidelines say the soil type is decided by an eight-foot-deep test hole, that it must be at least three feet wide and sloped on one side so a person can walk in, and that the applicant is responsible for the excavation. System size is determined by the soil type.

PHD also says garden-type backhoes cannot dig adequate test holes, which is a practical point when you are choosing who will do the work.

When people look into this

What the work usually looks like

  1. Contact PHD. Ask about the permit and about the Rathdrum Aquifer rule if it applies to your lot.
  2. Dig test holes. An eight-foot test hole is dug at the proposed drainfield, with a second about 75 feet away.
  3. Meet the district. Call the environmental health specialist before digging and ask to have the holes reviewed.
  4. Get the permit. The application and site plan are reviewed against state rules.
  5. Excavate and install. The tank, trenches and drainfield are dug to the approved plan.
  6. Get inspected before covering. The specialist inspects the system after its parts are joined together and before it is covered.

How to prepare

Before work starts, it helps to settle these points:

What affects the cost

Excavation is commonly priced by the hour for operator and machine, or as a set price for a defined scope. Septic work is priced in several pieces, and the dig is only one of them.

Why who digs the test holes matters

The test hole is the first and cheapest chance to find out whether a lot will work for a septic system. A hole that is too shallow, too narrow or in the wrong place wastes the district's visit, and a district visit that has to be repeated slows the permit. PHD notes that permits may take up to 10 working days after the district has been contacted about test hole completion, not from the time of application.

That is why it is worth asking who will dig the holes, with what machine and who will be on site when the specialist arrives. It is also worth asking who will cover the holes afterward and when.

Local rules and sources

Permits. Panhandle Health District (PHD) says anyone who constructs, alters or extends an individual sewage disposal system must hold a valid PHD permit, and anyone who contracts to do that work must hold a license from the district. PHD's guidelines also say no approvals are given verbally and no sewage system approval can be given until an application has been received.

Rathdrum Aquifer. PHD says installing a septic system on the Rathdrum Aquifer requires a parcel of at least five acres, a parcel created before December 20, 1977, or a location within a municipal sewage management area approved by the Board of Health.

Setbacks. PHD's guidelines list minimum distances, such as 100 feet from a drainfield to a well and 100 to 300 feet from streams, lakes and ponds depending on soil, 10 feet from a drainfield to a slab or crawl-space dwelling foundation and 20 feet to a basement. A septic tank must be at least 50 feet from a private well.

Do not dig in. PHD says do not dig test holes in draws, fill areas, wet areas, or near springs, wells or surface water.

Utility locates. Under Idaho Code 55-2205, the excavator marks the dig area in white paint and gives notice two to ten business days before digging. Once utilities mark their lines, the excavator is responsible for keeping the markings visible, and they stay valid for no more than four consecutive weeks. If digging hasn't started within three weeks of the notice, notice must be given again. Wait until every utility on the ticket has responded before you dig.

Registration. Idaho requires contractors to register with the Idaho Contractors Board at the Division of Occupational and Professional Licenses (DOPL). Idaho law counts excavating as construction (Idaho Code 54-5203). Some work is exempt, such as a single small project priced under $2,000 that is not part of a larger job (54-5205). Check the company on DOPL's public search before you agree to anything.

Reasons to trust this page

Common questions

Who approves septic work in Kootenai County?

Panhandle Health District issues the permits and inspects the work. PHD says anyone who constructs, alters or extends an individual sewage disposal system must hold a valid PHD permit, and anyone who contracts to do the work must hold a license from the district. No verbal approvals are given, so get everything in writing.

How is a septic test hole dug?

PHD's guidelines say soil type is decided by an eight-foot-deep test hole at least three feet wide and sloped on one side so a person can walk in. Start at the center of the proposed drainfield and dig another about 75 feet away. Call the environmental health specialist before digging and ask to have the holes reviewed.

Does the Rathdrum Aquifer change the rules?

Yes. PHD says installing a septic system on the Rathdrum Aquifer needs a parcel of at least five acres, a parcel created before December 20, 1977, or a location inside a municipal sewage management area approved by the Board of Health. Ask PHD whether your lot is on the aquifer.

When can a septic system be covered?

Only after approval. PHD says the environmental health specialist must inspect the system after its parts are joined and before it is covered, and that no portion may be covered without prior approval. Test holes should be covered soon after inspection because open holes are a hazard to livestock, wildlife and children.

What should a septic excavation price include?

Ask whether the price covers the tank, pipe, drain rock and fabric, the dig, backfill and hauling, and whether permit fees and the design are separate. Excavation is commonly priced by the hour or as a set price for a defined scope. Get the scope in writing, so prices from different companies cover the same work.